1/14/2024 0 Comments Interstate 80 detours![]() This work is scheduled to begin as listed, but is subject to change due to traffic incidents, weather, availability of equipment, and/or materials and construction related issues.įor 24/7 traffic updates, please visit 511. INTERSTATE 80 WB/EB DETOUR INFORMATION: Westbound I-80 travelers: Motorists traveling westbound will need to enter onto the I-680 connector ramp and travel southbound to connect to I-780 (Curtola Parkway) back onto I-80 while the overnight closures are in place. There won’t be access through the closure with the bridge coming downĬaltrans will utilize flaggers, as well as overhead and portable changeable message signs, alerting motorists of the detour and potential delays which are expected to be approximately 30-45 minutes. Westbound I-80 travelers: Motorists traveling westbound will need to enter onto the I-680 connector ramp and travel southbound to connect to I-780 (Curtola Parkway) back onto I-80 while the overnight closures are in place.Įastbound I-80 travelers: Motorists traveling eastbound on I-80 will need to exit Red Top Road onto Lopes Road back and follow the detour back onto the I-80 EB on-ramp. The full closure will begin at 11:00 PM on Saturday, Dec. SOLANO COUNTY – Caltrans will perform a 10-hour full Interstate 80 overnight closure near the City of Fairfield, as part of the Interstate 80/Interstate 680/State Route 12 Interchange Project, which will demolish the old existing eastbound SR-12 to eastbound I-80 connector bridge.Ĭrews will remove the existing bridge spans of the EB SR-12 to EB I-80 connector bridge. (I-80 WB/EB to be closed from Red Top Road to I-680 connector ramp) INTERSTATE 80/INTERSTATE 680/STATE ROUTE 12 INTERCHANGE PROJECTġ0 Hour Full Interstate 80 WB/EB Overnight Closure Call 511, visit, or download the Georgia 511 app.Full I-80 WB/EB Overnight Closure Dec. Before heading out, get real-time information on work status and traffic conditions. Snow during the morning will transition to snow showers during the afternoon. (MP 12)Īdvisory: Motorists are advised to expect delays, exercise caution, and reduce their speed while traveling thru work zones. Snow this evening will taper off to light snow late. North Williams St (MP 12.13) to Pine St.Only trucks needing access to Foundation Drive. ![]() Traffic will move to the southbound lanes, which will become one lane in each direction. SR25 North from Bay Street closed to through traffic. Burnsed Boulevard reduced to two lanes from Hwy 80 through the intersection of SR 25.Daily/Nightly Lane Closures Saturday and Sunday.Lane Closures Monday thru Friday, 7 a.m.Widening and Reconstruction for Additional Turn Lanes.West of Grove Blvd to East of Truss Plant Road.Nightly Lane Closures for Earth Work on Shoulders and Median.Mainline Left / Right Lane Closed due to Shoulder Widening.Daily Lane Closure & Flagging Operation.SR 21 Business 21 / Leola Road Screven County SR 25 Connector (Gloucester St.) Glynn County Daily/Nightly Lane Closures for Resurfacing.East Railroad St to the Glynn County Line.Nightly Lane Closures for Milling and Resurfacing.EB and WB Daily/Nightly Lane Closures for Resurfacing. ![]() Single Lane Traffic in Both Directions thru Work Zone.Daily Lane Closures for Bridge Construction Activities.SR 4/US 1 Over Altamaha River Appling-Toombs Co. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |